Before fixing panels place them without glue to ensure they fit properly.
Mur design wall panels installation.
They are not designed to soundproof a room.
Take into account the humidity level of the room where you will be installing your panels.
Murdesign offers a wide array of decorative wall and ceiling panels for your home.
Your walls must be leveled as much as possible.
Above all store your walldesign panels for a period of 48 to 72 hours in the room where you plan to install them.
Murdesign s tiles and panels have acoustic characteristics similar to those of gypsum.
They must be strongly fixed.
Plan an interval of 0 476 cm 3 16 inches at the corners of the walls as well as a space of 1 9 cm 3 4 inches at the bottom of each panel.
Instruction guide murdesign panels preparation.
Walldesign walldesign dress up your walls half walls and ceilings with quality decorative tiles panels offered in contemporary rustic and classic styled designs.
Leave panels in the room where you plan to install them between 48 and 72 hours prior to installation to acclimate panels to the room s temperature and humidity level.
A simple precaution will guarantee the problem free installation of your long lasting panels.
To successfully install your walldesign panels.
Although it is possible to install the panels on a surface other than a wall of gypsum or plywood we recommend having a solid base and level.
Plan an interval of 0 476 cm 3 16 inches at the corners of the walls as well as a space of 1 9 cm 3 4.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
Decorate each room in style with our high end quality products.